In hindsight, I wish I had asked a LOT more questions, interviewed more options, and had more flexibility with our timeline so that we could hire someone else.
The walls were framed with actual 2x4s (not the smaller, modern ones), then strips of cedar planks were affixed to them. And then dry wall was added on top . Demo took forever because of this.